Pro TechJob Reference


 

Our E&M engineering services includes the following categories. We have selected a series of projects and please click the category to view the list of the related descriptions and photos.

Category (A) - Construction and Installation
Category (B) - Maintenance & Inspection Service
Category (C) - Instrumentation and Control Systems
Category (D) - Decoration Project for Electrical and Mechanical Service
Category (E) - Design and Fabrication of Control Panel & Products


Category (a) -Construction and Installation

Photo

Clients

Description

Location

Completion

A31.*

Sanderson Group Theme Park Design (Macau)Limited

Volcano's Flame Effect - Instrumentation & Control Wiring Installation, Testing & Commissioning

Macau Fishermen's Wharf

2005

A30.* Raymonds Supply Co., Ltd. Volcano's Flame Effect - Heat Tracing System Installation fed from LPG Vaporiser Tank to Volcano's Accumulator Tank

Macau Fishermen's Wharf

2005

A29.*

Back Stage Technologies Inc.

Volcano's Flame Effect - PLC programming for special effects with real fires

Macau Fishermen's Wharf

2005

A28.* Raymonds Supply Co., Ltd. ELV Switchboard - Design and installation in production plant for safety use of electric tools by maintenance worker BackPoint of CLP Production Plant 2004

A27.*

The Hong Kong & China Gas Co., Ltd.

Flame Effect Control & Instrumentation Installation, Testing & Commissioning

Theme-Park in AdventureLand

2004

A26.*

The Hong Kong & China Gas Co., Ltd.

115% Enhancement Project for ID Fans, including trayworks, cabling and termination.

Tai Po Gas Production Plant

All to be completed  in 2006

A25.*

The Hong Kong & China Gas Co., Ltd.

Automatic Meter Recording (AMR) Data Logger Control Panel Installation at Various Restaurants.

All regions

2004

A24. *

The Hong Kong & China Gas Co., Ltd.

Essential Power Distribution including L.V. Switchboard modification works.

Ma Tau Kok Production Plant

‘2003

A23. *

Innovision Technology

Point of Sale System for LPG filling stations, including instrument and power cabling, server and card reader installation

Mei Foo and Tuen Mun ECO LPG filling stations

‘2002

A22.

Swire SITA

New installation of Reactors for Leachate Treatment Plant

Tseung Kwan O Landfill Site

‘2002

A21. *

U-tech Engineering Co., Ltd.

Automatic Meter Recording System, including concealed conduit running at new construction site for signal cabling, as well as detector installation and T&C

Sai Wan Ho

Pok Fu Lam Road,

Po Shan Road, Kwai Luen Road, South Bay Close, Hing Hon Road construction sites.

‘2002

A20.*

*

Fanling Rhenish Church Secondary School

Installation of Dual Socket Outlet for Computer use at New Computer Room.

Fanling Rhenish Church Secondary School

'2000

A19.

*

U-tech Engineering Co., Ltd.

Installation of Explosion Proof Bulkhead lighting and Retrofit defective Supply Cable

Beacon Hill Tunnel

'2000

A18.

*

The Hong Kong & China Gas

Power Supply and Control Wiring for Dry-Ice Plant

Tai Po Gas Production Plant

'2000

A17.

*

River Trade Terminal Co., Ltd.

Supply and installation of 13 sets of Floodlight at Yard.

Substation D3, D4 & D5

'2000

A16.

*

River Trade Terminal Co., Ltd.

Installation of conduit system for CCTV cabling at Lighting Tower

Tuen Mun Container Port

'99-2000

A15 .

*

Hang Yick Property Management Ltd.

Supply and Installation of 1600A TPFN 50% Housing Ground Outdoor Type Copper Busduct

Flora Plaza

'99-2000

A14. *

Po Leung Kuk

Installation of 16 nos. of 6 hp. Split Type A/C at 4/F Hall c/w Electrical Supply from G/F Switch Room

Po Leung Kuk Tang Yuk Tien College - Wu King Estate

'99

A13. *

The Hong Kong & China Gas

Rewiring of existing armoured cable with new Fire-resist cable and cable tray inside Naphtha Tank.

Phase II Tai Po Gas Production Plant

'98-'99

A12. *

Mary Help of Christians Church

Rewiring and upgrading of fixed electrical installation in issue of WR2.

Church at Tang King Po School

'98-'99

A11.

MTRC

Cable trunking and 8" G.I. conduit Installation for the cabling of P.A., CCTV, Security and F.S. cables. Aims to combine the control room between two phases.

Phase I and Phase II of Telford Plaza, Kowloon Bay.

'98-'99

A10. *

River Trade Terminal Co., Ltd.

Power Supply for the Temporary Workshop and Office at Container Field

Lung Mun Road Container Port

'98-'99

A9.

Electro-paint Limited

Production Line for the coat paint of Marine Motor

OMC Tsing Yi Production Plant

'98-'99

A8. *

Hong Kong Telecom.

Cable Trunking Installation at MDF Rooms for Computer cabling at each floor

HACTL Super Terminal

'98

A7. *

The Hong Kong & China Gas

Rewiring for the MCB Board and outgoing circuit for the Explosion Proof Lighting Fixture at Reactors

Ma Tau Kok Production Plant

'98

A6. *

K. M. Luk

Installation of Cable Tray for Computer Signalling at Station

MTRC Airport Express - Kowloon Station (C566)

'97

A5.

Nexen Construction Material Supply

L.V. Switchboard and control circuit for Crusher System Production Line.

Chek Lap Kok North nearby seashore

'97

A4. *

The Hong Kong & China Gas

Electrical installation of UPS system including L.V. Switchboard, cable tray, cabling and terminaton

Phase II Tai Po Gas Production Plant

'97

A3. *

HongKong International Terminal (HIT)

Electrical installation of Automatic Transfer Scheme (ATS) at sub-stations for Backup supply

Container Terminal 4, 5, 6 and 7

'97

A2.

AMEC

Electrical installation of 750kVA x 2 Generator Set for the Emergency Supply of Building

Sai Kung Government Office

'95

A1. *

Dragages et Travaux Publics

CLP switchroom, HVAC and L.V. Electrical installation for the Site Office.

Route 3 - Countryside Park at Ting Kau Site

'95

Click here to back to TOP


Category (b) - Maintenance  & Inspection Service

Photo

Clients

Description

Location

Completion

B13.*

PCCW Limited

L.V. Switchboard, AC MCC, Genset Switchboard and Fixed Electrical Installation Inspection for EMSD Endorsement of WR2.

12 numbers of Telecom Exchange around HK, Kowloon and N.T..

2004

B12.

Sunbase Property Management Ltd.

Closed Circuit TV (CCTV), Public Addressing (P.A.), Motivated & Fixed Targets Systems Maintenance including, electronic and electrical circuit design.

Tsing Shan Shooting SimCity

‘2003

B11. *

PCCW

5-yearly inspection in L.V. Essential Final Circuits for all Satellite Stations

Stanley Earth Station (SES)

2002

 

B10. *

Citex Vigers Ltd.

5-yearly inspection in L.V. Final Circuits for the Whole Building at Technical Training Centre

PCCW – Technical Training Centre (TDC)

2001

B9. *

Citex Vigers Ltd.

5-yearly inspection in L.V. Final Circuits for the Whole Building at Hong Kong Telecom Tower

PCCW - Hongkong Telecom Tower (TTW)

2000

B8. *

Goodwell Property Management

Defect Retrofit for 5-yearly inspection in L.V.  Final Circuits for Public Lighting and Power in issue of WR2.

Rosary Villa

'97 to '98

B7.

First Pacific Davies

Defect Retrofit for 5-yearly inspection in L.V. switchboard and Final Circuits for Public Lighting and Power in issue of WR2.

New Mandarin Plaza

'97 to '98

B6. *

PCCW (Hong Kong Telecom)

L.V. Switchboard and Final Circuits Inspection in issue of WR2.

48 numbers of Telephone Exchange around Kowloon and N.T..

'96 to '98

B5. *

Dairy Farm

Inspection of New Production Plant for any Defects of Electrical Installation and report to the Client as the Punch List for main contractor

Yuen Long Industrial Estate

'95

B4. *

Colliers Jardine

CCTV System and Gate Entrance Maintenance for Property Management Dept.

Kowloon Tong

'95

B3. *

Carlsberg Brewery

Annual inspection & maintenance work for Electrical System

Tai Po Production Plant

'95

B2. *

The Hong Kong & China Gas

11kV and 3300V H.V. and L.V. Switchboard annual maintenance in issue of WR2.

Phase II Tai Po Gas Production Plant

'95 & '96

B1. *

COSCO-HIT

11kV and 380V H.V. and L.V. Switchboard annual maintenance in issue of WR2.

Container Terminal 8

Lunar New Year of '95 & '96

Click here to back to TOP


Category (c) - Instrumentation and Control Systems

Photo

Clients

Description

Location

Completion

C13.*

The Hong Kong & China Gas Co., Ltd.

115% Enhancement Project for Natural Gas Conversion, including trayworks, cabling and termination, testing and commissioning for instrumentation.

Tai Po Gas Production Plant

All to be completed  by 2006

C12.*

U-tech Engineering Co., Ltd

CCMS Signal Interface between Corolla Pack Water Heater and Main BMS, including design of control logic and installation of system

Castle Peak Hospital New constructed Block D and Block F

2001

C11.*

U-tech Engineering Co., Ltd.

Solar Panel Power System Installation in various Offtake Stations

9 numbers of offtake station in all regions

2001

C10.*

U-tech Engineering Co., Ltd.

Telephone Ringer and Door Sensor System Installation in Offtakes Stations

13 offtakes station in different regions

2001

C9.*

U-tech Engineering Co., Ltd.

Power supply for Control Valves Actuators in Offtake Stations.

3 offtakes station in different regions

2001

C8. *

The Hong Kong & China Gas

O2 Analyser Installation, Cabling, Testing & Commissioning

Tai Po Gas Production Plant

'99

C7. *

The Hong Kong & China Gas

Dosing Pump Piping and Tubing Installation Work

Tai Po Gas Production Plant

'99

C6. *

Hongkong Telecom

Installation and Upgrading of Flameproof Fuel Pump & Control Circuits for Generator Set.

Yuen Chau Kok, Hung Hom and Po Man Exchange

'97

C5. *

The Hong Kong & China Gas

Auto-Restart Project by integrating Programmable Logic Controller (PLC) in case of disoperation of the production plant.

Tai Po Gas Production Plant Phase II

'97 to '98

C4.

Royal Observatory

Installation of Terminal Doppler Weather Radar  (System: Raytheon Service Co., U.S.A.) for the Weather Alert System for Arrival and Departure at Chek Lop Kok Control Tower. Works included the installation of Radar, Microwave waveguide system, Computer System and Gobal Positioning System (GPS).

Tai Lam Chung

'96 to '97

C3. *

The Hong Kong & China Gas

Installation and Upgrading of 'Programmable Logic Controller'

Tai Po Gas Production Plant Phase II

'95 to '97

C2. *

Mobil Oil Hong Kong

Construction of Instrumentation Control system including Level, Pressure, Temperature and Flow Control Transducer. As well as its Computer-controlled Inventory System, Oil Mixing System, and Intake / Offtake System.

Mobil Oil New Tsing Yi Fuels Terminal

'92 to '93

C1. *

The Hong Kong & China Gas

Installation, Supply and Maintenance of Instrumentation Control System in Production Plant

Tai Po Gas Production Plant Phase II

'90 up to Right Now

Click here to back to TOP


Category (d) - Decoration Project for Electrical and Mechanical Service

Photo

Clients

Description

Location

Completion

D2.

Hong Kong Baptist University

Electrical and HVAC Installation for Renovation at Lui Ming Choi Library

Ho Sin Hang Campus of HKBU.

'97

D1. *

COSCO-HIT

Construction of workshop office for electrical and mechanical department.

Container Terminal 8

'96 to '97

Click here to back to TOP


Category (e) - Design & Fabrication of Control Panels and Products

Photo

Clients

Description

Location

Completion

E1.*

The Hong Kong & China Gas Co., Ltd.

Mechanical Exhaust Interkock for Water Heaters - Gas Inlet Shut-down Equipment in accordance with Gas Appliance Regulation

Wellcome Superstore

2005

E2.*

The Hong Kong & China Gas Co., Ltd.

Design & Modification of Burner Management System (BMS) Control Panel for Reactor.

Tai Po Gas Production Plant

All to be completed by 2006

E3.*

The Hong Kong & China Gas Co., Ltd.

Design & Modification of "Modicon 984 Quantum Series" PLC Control Panel for 115% Natural Gas Conversion Project.

Tai Po Gas Production Plant