Photo
|
Clients
|
Description
|
Location
|
Completion
|
|
A31.* |
Sanderson Group Theme
Park Design (Macau)Limited |
Volcano's Flame Effect
- Instrumentation & Control Wiring Installation, Testing & Commissioning |
Macau Fishermen's Wharf |
2005 |
|
A30.* |
Raymonds Supply Co., Ltd. |
Volcano's Flame Effect - Heat Tracing System
Installation fed from LPG Vaporiser Tank to Volcano's Accumulator Tank |
Macau Fishermen's Wharf |
2005 |
|
A29.* |
Back Stage Technologies
Inc. |
Volcano's Flame Effect
- PLC programming for special effects with real fires
|
Macau Fishermen's Wharf |
2005 |
|
A28.* |
Raymonds Supply Co., Ltd. |
ELV Switchboard - Design and installation in
production plant for safety use of electric tools by maintenance worker |
BackPoint of CLP Production Plant |
2004 |
|
A27.* |
The Hong Kong & China Gas Co., Ltd. |
Flame Effect Control &
Instrumentation Installation, Testing & Commissioning |
Theme-Park in
AdventureLand |
2004 |
|
A26.* |
The Hong Kong & China Gas Co., Ltd.
|
115% Enhancement Project for ID Fans, including trayworks,
cabling and termination.
|
Tai Po Gas Production Plant
|
All to be completed in
2006
|
|
A25.*
|
The Hong Kong & China Gas Co., Ltd.
|
Automatic Meter
Recording (AMR) Data Logger Control Panel
Installation at Various Restaurants. |
All regions |
2004 |
|
A24. *
|
The Hong Kong & China Gas Co., Ltd.
|
Essential Power Distribution including L.V. Switchboard
modification works.
|
Ma Tau Kok Production Plant
|
‘2003
|
|
A23. *
|
Innovision Technology
|
Point of Sale System for LPG filling stations, including
instrument and power cabling, server and card reader installation
|
Mei Foo and Tuen Mun ECO LPG filling stations
|
‘2002
|
|
A22.
|
Swire SITA
|
New installation of Reactors for Leachate Treatment Plant
|
Tseung Kwan O Landfill Site
|
‘2002
|
|
A21. *
|
U-tech Engineering Co., Ltd.
|
Automatic Meter Recording System, including concealed conduit
running at new construction site for signal cabling, as well as
detector installation and T&C
|
Sai Wan Ho
Pok
Fu Lam Road,
Po Shan Road, Kwai Luen Road, South Bay
Close, Hing Hon Road construction sites.
|
‘2002
|
|
A20.*
*
|
Fanling
Rhenish
Church
Secondary
School
|
Installation of Dual Socket Outlet for Computer use at New
Computer Room.
|
Fanling
Rhenish
Church
Secondary
School
|
'2000
|
|
A19.
*
|
U-tech Engineering Co., Ltd.
|
Installation of Explosion Proof Bulkhead lighting and Retrofit
defective Supply Cable
|
Beacon Hill Tunnel
|
'2000
|
|
A18.
*
|
The Hong Kong & China Gas
|
Power Supply and Control Wiring for Dry-Ice Plant
|
Tai Po Gas Production Plant
|
'2000
|
|
A17.
*
|
River Trade Terminal Co., Ltd.
|
Supply and installation of 13 sets of Floodlight at Yard.
|
Substation D3, D4 & D5
|
'2000
|
|
A16.
*
|
River Trade Terminal Co., Ltd.
|
Installation of conduit system for CCTV cabling at
Lighting
Tower
|
Tuen Mun Container Port
|
'99-2000
|
|
A15 .
*
|
Hang Yick Property Management Ltd.
|
Supply and Installation of 1600A TPFN 50% Housing Ground Outdoor
Type Copper Busduct
|
Flora
Plaza
|
'99-2000
|
|
A14. *
|
Po Leung Kuk
|
Installation of 16 nos. of 6 hp. Split Type A/C at 4/F Hall c/w
Electrical Supply from G/F Switch Room
|
Po
Leung
Kuk
Tang
Yuk
Tien
College - Wu King Estate
|
'99
|
|
A13. *
|
The Hong Kong & China Gas
|
Rewiring of existing armoured cable with new Fire-resist cable
and cable tray inside Naphtha Tank.
|
Phase II Tai Po Gas Production
Plant
|
'98-'99
|
|
A12. *
|
Mary Help of Christians Church
|
Rewiring and upgrading of fixed electrical installation in issue
of WR2.
|
Church at Tang King
Po
School
|
'98-'99
|
|
A11.
|
MTRC
|
Cable trunking and 8" G.I. conduit Installation for the
cabling of P.A., CCTV, Security and F.S. cables. Aims to combine the
control room between two phases.
|
Phase I and Phase II of Telford
Plaza,
Kowloon
Bay.
|
'98-'99
|
|
A10. *
|
River Trade Terminal Co., Ltd.
|
Power Supply for the Temporary Workshop and Office at Container
Field
|
Lung Mun Road Container Port
|
'98-'99
|
|
A9.
|
Electro-paint Limited
|
Production Line for the coat paint of Marine Motor
|
OMC Tsing Yi Production Plant
|
'98-'99
|
|
A8. *
|
Hong Kong Telecom.
|
Cable Trunking Installation at MDF Rooms for Computer cabling at
each floor
|
HACTL Super Terminal
|
'98
|
|
A7. *
|
The Hong Kong & China Gas
|
Rewiring for the MCB Board and outgoing circuit for the
Explosion Proof Lighting Fixture at Reactors
|
Ma Tau Kok Production Plant
|
'98
|
|
A6. *
|
K. M. Luk
|
Installation of Cable Tray for Computer Signalling at Station
|
MTRC
Airport Express -
Kowloon Station (C566)
|
'97
|
|
A5.
|
Nexen Construction Material Supply
|
L.V. Switchboard and control circuit for Crusher System
Production Line.
|
Chek Lap Kok North nearby seashore
|
'97
|
|
A4. *
|
The Hong Kong & China Gas
|
Electrical installation of UPS system including L.V.
Switchboard, cable tray, cabling and terminaton
|
Phase II Tai Po Gas Production
Plant
|
'97
|
|
A3. *
|
HongKong International Terminal (HIT)
|
Electrical installation of Automatic Transfer Scheme (ATS) at
sub-stations for Backup supply
|
Container Terminal 4, 5, 6 and 7
|
'97
|
|
A2.
|
AMEC
|
Electrical installation of 750kVA x 2 Generator Set for the
Emergency Supply of Building
|
Sai Kung Government Office
|
'95
|
|
A1. *
|
Dragages et Travaux Publics
|
CLP switchroom, HVAC and L.V. Electrical installation for the
Site Office.
|
Route 3 - Countryside
Park at Ting Kau Site
|
'95
|
|
Photo
|
Clients
|
Description
|
Location
|
Completion
|
|
B13.* |
PCCW Limited
|
L.V. Switchboard, AC MCC, Genset Switchboard and Fixed Electrical
Installation Inspection for EMSD Endorsement of WR2.
|
12 numbers of Telecom Exchange around HK, Kowloon and N.T..
|
2004 |
|
B12.
|
Sunbase Property Management Ltd.
|
Closed Circuit TV (CCTV), Public Addressing (P.A.), Motivated
& Fixed Targets Systems Maintenance including, electronic and
electrical circuit design.
|
Tsing Shan Shooting SimCity
|
‘2003
|
|
B11. *
|
PCCW
|
5-yearly inspection in L.V. Essential Final Circuits for all
Satellite Stations
|
Stanley Earth Station
(SES)
|
2002
|
|
B10. *
|
Citex Vigers Ltd.
|
5-yearly inspection in L.V. Final Circuits for the
Whole
Building at Technical
Training Centre
|
PCCW – Technical Training Centre (TDC)
|
2001
|
|
B9. *
|
Citex Vigers Ltd.
|
5-yearly inspection in L.V. Final Circuits for the
Whole
Building at
Hong Kong
Telecom
Tower
|
PCCW - Hongkong
Telecom
Tower (TTW)
|
2000
|
|
B8. *
|
Goodwell Property Management
|
Defect Retrofit for 5-yearly inspection in L.V. Final
Circuits for Public Lighting and Power in issue of WR2.
|
Rosary Villa
|
'97 to '98
|
|
B7.
|
First Pacific Davies
|
Defect Retrofit for 5-yearly inspection in L.V. switchboard and
Final Circuits for Public Lighting and Power in issue of WR2.
|
New Mandarin
Plaza
|
'97 to '98
|
|
B6. *
|
PCCW (Hong Kong Telecom)
|
L.V. Switchboard and Final Circuits Inspection in issue of WR2.
|
48 numbers of Telephone Exchange around Kowloon and N.T..
|
'96 to '98
|
|
B5. *
|
Dairy Farm
|
Inspection of New Production Plant for any Defects of Electrical
Installation and report to the Client as the Punch List for main contractor
|
Yuen Long Industrial Estate
|
'95
|
|
B4. *
|
Colliers Jardine
|
CCTV System and Gate Entrance Maintenance for Property
Management Dept.
|
Kowloon Tong
|
'95
|
|
B3. *
|
Carlsberg Brewery
|
Annual inspection & maintenance work for Electrical System
|
Tai Po Production Plant
|
'95
|
|
B2. *
|
The Hong Kong & China Gas
|
11kV and 3300V H.V. and L.V. Switchboard annual maintenance in
issue of WR2.
|
Phase II Tai Po Gas Production Plant
|
'95 & '96
|
|
B1. *
|
COSCO-HIT
|
11kV and 380V H.V. and L.V. Switchboard annual maintenance in
issue of WR2.
|
Container Terminal 8
|
Lunar New Year of '95 & '96
|
|
Photo
|
Clients
|
Description
|
Location
|
Completion
|
|
C13.*
|
The Hong Kong & China Gas Co., Ltd.
|
115% Enhancement Project for Natural Gas Conversion, including
trayworks, cabling and termination, testing and commissioning for
instrumentation.
|
Tai Po Gas Production Plant
|
All to be completed by
2006
|
|
C12.*
|
U-tech Engineering Co., Ltd
|
CCMS Signal Interface between Corolla Pack Water Heater and Main
BMS, including design of control logic and installation of system
|
Castle Peak Hospital New constructed Block D and Block F
|
2001
|
|
C11.*
|
U-tech Engineering Co., Ltd.
|
Solar Panel Power System Installation in various Offtake Stations
|
9 numbers of offtake station in all regions
|
2001
|
|
C10.*
|
U-tech Engineering Co., Ltd.
|
Telephone Ringer and Door Sensor System Installation in Offtakes
Stations
|
13 offtakes station in different regions
|
2001
|
|
C9.*
|
U-tech Engineering Co., Ltd.
|
Power supply for Control Valves Actuators in Offtake Stations.
|
3 offtakes station in different regions
|
2001
|
|
C8. *
|
The Hong Kong & China Gas
|
O2 Analyser Installation, Cabling, Testing & Commissioning
|
Tai Po Gas Production Plant
|
'99
|
|
C7. *
|
The Hong Kong & China Gas
|
Dosing Pump Piping and Tubing Installation Work
|
Tai Po Gas Production Plant
|
'99
|
|
C6. *
|
Hongkong Telecom
|
Installation and Upgrading of Flameproof Fuel Pump & Control
Circuits for Generator Set.
|
Yuen Chau Kok, Hung Hom and Po Man Exchange
|
'97
|
|
C5. *
|
The Hong Kong & China Gas
|
Auto-Restart Project by integrating Programmable Logic Controller
(PLC) in case of disoperation of the production plant.
|
Tai Po Gas Production Plant Phase II
|
'97 to '98
|
|
C4.
|
Royal Observatory
|
Installation of Terminal Doppler Weather Radar (System:
Raytheon Service Co., U.S.A.) for the Weather Alert System for Arrival
and Departure at Chek Lop Kok Control Tower. Works included the
installation of Radar, Microwave waveguide system, Computer System and
Gobal Positioning System (GPS).
|
Tai Lam Chung
|
'96 to '97
|
|
C3. *
|
The Hong Kong & China Gas
|
Installation and Upgrading of 'Programmable Logic Controller'
|
Tai Po Gas Production Plant Phase II
|
'95 to '97
|
|
C2. *
|
Mobil Oil Hong Kong
|
Construction of Instrumentation Control system including Level, Pressure,
Temperature and Flow Control Transducer. As well as its
Computer-controlled Inventory System, Oil Mixing System, and Intake /
Offtake System.
|
Mobil Oil New Tsing Yi Fuels Terminal
|
'92 to '93
|
|
C1. *
|
The Hong Kong & China Gas
|
Installation, Supply and Maintenance of Instrumentation Control
System in Production Plant
|
Tai Po Gas Production Plant Phase II
|
'90 up to Right Now
|